In the meantime, here's what was done on Mars this week:
Trim on the outside (garage side) of the door to the new room:
Trim on the inside:
The wall above and next to the re-done bathroom tile has been repaired:
Ready for repainting!
Mr. Bunkport put the flange on the toilet drain:
And they started to install the rail for the door:
(The blue tape is marking which bolts are anchored in studs.)
Next up: installing the door, toilet, sink and cabinet, and tub faucets.
That door is gonna be *awesome*.
ReplyDelete