Monday
Sheetrock was finished on Monday. Also, the bottom outside step was replaced and the whole staircase was bolted to the concrete:
Safety Inspector Pickles signed off on the work.
Tuesday
I'm not sure why, but the top step was replaced on Tuesday, and a railing along the landing was replaced.
This also passed Pickles' careful inspection.
The cement was poured for the footers:
The work to level the kitchen floor was done. It's a combination of special board and some kind of concrete-like substance:
Pickles, in her zeal to inspect the work, stepped right where she wasn't supposed to:
Oops.
Wednesday
For some reason, they blocked up the bathroom door on Wednesday:
Not sure what's lurking in there now.
They put most of the interior trim in downstairs:
And started on the trim upstairs:
They also took the forms off the footers for the stairs:
Thursday
Trim downstairs was finished:
And they got most of the way there upstairs:
Stairs back in business!
Meanwhile, Pickles had a particularly good scavenging week:
Lots of fast food wrappers all over the place, & unfortunately, chicken bones. I mostly got things away from her before she could eat them, but she got a couple bones before I saw them. Not good for her, but she seems ok.
They began installation of the kitchen floor on Friday:
Saturday
They continued it on Saturday:
A few hours' worth of work left on the floor, & essentially we'll have our kitchen & dining room back.
Inspector Pickles, coming in from a tiring walk, took one look at the cool floor & flopped down:
Approved!
Next up: finishing the floor, working on the bathroom, light switches and outlets.